000 02197nam a2200409 i 4500
001 012926349
003 EG-GaU‬‬
005 20220217133201.0
006 m b
007 ta
007 co |g|||||||||
008 040527s2002 xxua 001 0 eng
010 _a2001041039
015 _aGBA441732
_2bnb
020 _a0072435801 (cased) :
_cNo price
040 _aGALALA University
_beng
_cEG-GaU
_dEG
_erda
082 0 4 _a692.5
_223
_bP. R. E.
100 1 _aPeurifoy, R. L.
_q(Robert Leroy),
_d1902-1995.
_eauthor
_925355
245 1 0 _aEstimating construction costs /
_cRobert L. Peurifoy, Garold D. Oberlander.
250 _aFifth edition.
264 1 _aBoston, Mass. ;
_aLondon :
_bMcGraw-Hill,
_cc2002.
264 4 _c©2002
300 _axvi, 560 pages :
_billustrations ;
_c25 cm.
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
490 1 _aThe McGraw-Hill series in construction engineering and project management
500 _aPrevious ed.: 1989.
500 _aOne CD-ROM in pocket attached to inside back cover of book.
500 _aIncludes index.
505 0 0 _t1 Introduction --
_t2 Bid Documents --
_t3 Estimating Process --
_t4 Conceptual Cost Estimating --
_t5 Cost of Construction Labor and Equipment --
_t6 Handling and Transporting Material --
_t7 Earthwork and Excavation --
_t8 Highways and Pavements --
_t9 Foundations --
_t10 Concrete Structures --
_t11 Steel Structures --
_t12 Carpentry --
_t13 Interior Finish, Millwork, and Wallboards --
_t14 Roofing and Flashing --
_t15 Masonry --
_t16 Floor Systems --
_t17 Floor Finishes --
_t18 Glass and Glazing --
_t19 Painting --
_t20 Plumbing --
_t21 Electrical Wiring --
_t22 Sewerage Systems --
_t23 Water Distribution Systems --
_t24 Total Cost of Engineering Projects --
_t25 Computer Estimating Appendix A Abbreviations Appendix B Example Project.
650 7 _aBuilding
_xEstimates
_zUnited States.
_2GU-sh‬‬
_925356
700 1 _aOberlander, Garold D.
_eauthor
_925357
830 0 _aMcGraw-Hill series in construction engineering and project management.
_925358
942 _2ddc
_cBK
999 _c154
_d154