Amazon cover image
Image from Amazon.com

Estimating construction costs / Robert L. Peurifoy, Garold D. Oberlander.

By: Contributor(s): Material type: TextTextSeries: McGraw-Hill series in construction engineering and project managementPublisher: Boston, Mass. ; London : McGraw-Hill, c2002Copyright date: ©2002Edition: Fifth editionDescription: xvi, 560 pages : illustrations ; 25 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0072435801 (cased) :
Subject(s): DDC classification:
  • 692.5 23 P. R. E.
Contents:
1 Introduction -- 2 Bid Documents -- 3 Estimating Process -- 4 Conceptual Cost Estimating -- 5 Cost of Construction Labor and Equipment -- 6 Handling and Transporting Material -- 7 Earthwork and Excavation -- 8 Highways and Pavements -- 9 Foundations -- 10 Concrete Structures -- 11 Steel Structures -- 12 Carpentry -- 13 Interior Finish, Millwork, and Wallboards -- 14 Roofing and Flashing -- 15 Masonry -- 16 Floor Systems -- 17 Floor Finishes -- 18 Glass and Glazing -- 19 Painting -- 20 Plumbing -- 21 Electrical Wiring -- 22 Sewerage Systems -- 23 Water Distribution Systems -- 24 Total Cost of Engineering Projects -- 25 Computer Estimating Appendix A Abbreviations Appendix B Example Project.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode Item holds
Books Books Media and mass communication Library AL4 692.5 P. R. E. Available E0000445
Total holds: 0

Previous ed.: 1989.

One CD-ROM in pocket attached to inside back cover of book.

Includes index.

1 Introduction -- 2 Bid Documents -- 3 Estimating Process -- 4 Conceptual Cost Estimating -- 5 Cost of Construction Labor and Equipment -- 6 Handling and Transporting Material -- 7 Earthwork and Excavation -- 8 Highways and Pavements -- 9 Foundations -- 10 Concrete Structures -- 11 Steel Structures -- 12 Carpentry -- 13 Interior Finish, Millwork, and Wallboards -- 14 Roofing and Flashing -- 15 Masonry -- 16 Floor Systems -- 17 Floor Finishes -- 18 Glass and Glazing -- 19 Painting -- 20 Plumbing -- 21 Electrical Wiring -- 22 Sewerage Systems -- 23 Water Distribution Systems -- 24 Total Cost of Engineering Projects -- 25 Computer Estimating Appendix A Abbreviations Appendix B Example Project.

There are no comments on this title.

to post a comment.